Engineering & Construction
Projects Under Design
Project Name | City | Project Type | Location | Estimated Construction Period |
---|---|---|---|---|
Banklick Rd | Wilder | Water Main Replacement | 180' East of #118 to end of the road | April 22, 2024 to June 6, 2024 |
Donaldson Rd | Erlanger | Water Main Relocation | Cherry Tree Ln to Mineola Pk | May 1, 2023 to September 30, 2025 |
East 1st Street | Silver Grove | Water Main Replacement | Four Mile Rd to Maple St | March 4, 2024 to April 18, 2024 |
Garvey Ave | Elsmere | Water Main Replacement | Florence Ct to #1451 | May 6, 2024 to June 20, 2024 |
Houston Rd | Erlanger | Water Main Relocation | Sycamore Tree Ln to Donaldson Rd | April 8, 2024 to TBD |
Independence Tank | Independence | Tank Painting | 11574 Water Tower Way | March 1, 2024 to May 1, 2024 |
Kentaboo Ave | Erlanger | Water Main Replacement | Dixie Highway to Boone Co Line | December 4, 2023 to April 15, 2024 |
KY 236 | Hebron | Water Main Relocation | Donaldson Road to I-275 | June 1, 2022 to TBA |
KY 536 | Independence | Water Main Relocation | Bristow Road to Boone County Line | Spring 2022 to Spring 2024 |
Leslie, E Orchard, W Maple | Ft Mitchell | Water Main Replacement | E Orchard to end of street, 71/75 to end of street, Dixie Hwy to Fort Mitchell Pointe | April 8, 2024 to July 17, 2024 |
Meter Replacement | All Cities | Reading System Replacement | Entire Service Area | October 2021 to January 2025 |
Monte Casino | Covington | Water Main Replacement | Highland Avenue to end of Tower Drive | February 12, 2024 to July 11, 2024 |
Montgomery Dr | Erlanger | Water Main Replacement | Dixie Highway to Russell McClure | March 1, 2024 to April 30, 2024 |
North Reservoir | Ft Thomas | Reservoir Restoration | Memorial Parkway Treatment Plant | November 1, 2023 to May 31, 2024 |
Rose Ave | Highland Heights | Water Main Replacement | Alexandria Pk to end of street | May 6, 2024 to June 30, 2024 |
Current Projects
Standard Drawings 2021
View the Entire PDF Document:
2021 Standard Specifications and Drawings for the Installation of Water Mains
View the Water Main Extension Agreement:
View a Specific Subject
General Specifications for Water Mains
100 - Water Main Installation - General Specifications
100A - Water Main Installation - General Specifications
100B - Water Main Installation - General Specifications
100C - Water Main Installation - General Specifications
100D - Water Main Installation - General Specifications
100E - Water Main Installation - General Specifications
100F - Water Main Installation - General Specifications
100G - Water Main Installation - General Specifications
101 - Water Mains Terminations
102 - Water Mains Terminations
103 - Typical Pipeline Trench Detail
103A - Typical Pipeline Trench Detail
104 - Concrete Thrust Block Detail
104A - Concrete Thrust Blocking for Vertical Bends
104M - Concrete Thrust Block Detail
104M1 - Concrete Thrust Blocking for Vertical Bends
105 - Valve Box and Valve Pad Detail
106 - Air Release Valve
107 - 5/8" and 1" Meter Setting Copper
107A - 5/8" and 1" Meter Setting Pex-A Service Line
108 - 1-1/2" and 2" Meter Setting
108A - 1-1/2" and 2" Meter Setting Requiring Pressure Regulator
109 - Hydrant Assembly
110 - Concrete Encasement at Creek Crossing
111 - Tracing Wire Installation Detail
112 - Adjusting Ring and Lid to Grade
113 - Typical Flushing Device Installation and Manual Release Valve
114 - Encasement Pipe Detail
115 - 2" P.E. Around Cul-de-sac
Standard Specifications and Drawings for the Installation of Meter Pits
201 - Material Specifications for Pit Construction
201A - Material Specifications for Pit Construction
202 - Typical Pit Detail
203 - Piping Specifications for Pit Construction
204 - Double Check Valvue Settings for Fire Systems Only
205R - Meter Settings 2.5 " and Larger
206 - Dual Service Branch Settings with 2" or 1-1/2" Meters
206A - Dual Service Branch Settings with 1" and Smaller Meter