Recent Procurement Results
Below are the tentative results of recent Bid Openings for services
or purchases requested by the District.
Final results are subject to the approval of the District’s
Board of Commissioners.
Meter Reading System Replacement – for Bid Results, please contact Barry Miller at 859-578-7892 or via e-mail at: bmiller@nkywater.org
Final Bid Submission Report for Water Treatment Chemicals
E. Main St. (Ph. 2) Water Main Replacement
District Vehicle 2021 Bid
Asphalt Mill & Pave
TMTP and Tanks Security Upgrades
Aggregate Materials for 2021
Cold Water Meter Bid
Aqua Drive Tank Painting and Dudley 1080 Tank Repairs
Sagebrush Ln. & Shadyside Dr. Water Main Replacement
Lexington Dr. & Woodward St. Water Main Replacement
Robin Lane Water Main Replacement
Topsoil Restoration
Flowable Fill & Concrete
2021 Distribution Materials ‐ Final Bid Tabulation Summary
Fort Thomas Treatment Plant Phase 2 Basin Improvements
Copper (3/4" and 1")
St. Joseph Lane Water Main Replacement
Asphalt Milling & Paving Fall, 2020
Central Facility Roof Replacment and Preventative Maintenance
Greenup St. Water Main Connection
Persimmon, Sassafras, Sugar Tree, Walnut & Willow
Water Main Replacement
Fort Thomas Treatment Plant Raw Water Reservoir Solids Removal
Fort Thomas Treatment Plant Residuals Handling Improvements
Crowell Ave. & Eustace Ave. Water Main Replacement
Dudley Pump Control Valves
Asphalt Mill & Pave
Ultrasonic Fire Rated Water Meter
SCADA Improvements
Human Machine Interface Hardware and Software Upgrade
Storage Area Network Equipment Purchase and Installation
Leak Detection Equipment |